Contract ID | Brief Description | Award Date | Completion Date | Final Contract Value | |||
NYCDOT BRC-270FR | Rehabilitation of the Brooklyn Bridge Stone Masonry Walls at Approaches and Ramps | 08/19/2020 | $15,550,000 | ||||
NYCDOT HBM-1056 | Rehabilitation of Houston St. Overpass over the FDR Drive - MANHATTAN, NY | 11/15/2017 | $18,423,000 | ||||
NYCDOT HBM-1120 | Rehabilitation of 11th Avenue Bridge Viaduct - MANHATTAN, NY | 09/30/2011 | $24,302,312 | ||||
PANYNJ LGA-124.041 | Rehabilitation of the 102nd Street Bridge over the Grand Central Parkway - FLUSHING, NY | 12/31/2006 | $12,534,471 | ||||
NYCDOT BRC-289D | Deck and Miscellaneous Repairs for Riker's Island Bridge - QUEENS, NY | 12/31/2007 | $20,696,000 |
- Details
- Category: Roads & Bridges
- Hits: 836
|
The general scope of work for the rehabilitation of stone masonry walls at bridge approaches and ramps (BIN 2-24001-9 and BIN 2-26789-0) are removal and replacement of masonry stones, cladding, and capstones at walls, abutments, and facades; removal and replacement of sidewalks along the walls; repair of deteriorated and spalls on walls as necessary; as well as cleaning, repointing and anchoring of masonry stones; and installation of 2 roll-up doors on abutment. |
- Details
- Category: Roads & Bridges
- Hits: 615
|
The general scope of work for the main bridge structure (BIN 2-23204-0) are demolition of the entire two-span, reinforced concrete slab superstructure, and replacement with new two-span pre-stressed concrete slab units; demolition and replacement of existing center pier cap, steel columns, and reconstruction of the abutment walls for substructure. The superstructure includes deck slab, sidewalks, center median, parapets with fencing, lampposts and signal posts. |
- Details
- Category: Roads & Bridges
- Hits: 514
|
|
- Details
- Category: Roads & Bridges
- Hits: 545
|
Gateway Industries Inc. provided all the necessary Maintenance & Protection of Traffic in three (3) Stages of the 700 LF bridge to complete work during daily day-time and night-time work of LaGuardia Airport as well as commuters traveling on the Grand Central Parkway.
|